Washington, DC
Owner: National Park Service
On site work included:
- Site Electrical, and Utilities
- Stone Work
- New 4000 Seats
- Emergency generator UPS Backup system
- Installation of two electrical towers
- 2 New Electrical Systems
The project posed several challenges that were met while execution:
- Work was completed during the cold winter months
- Poor soil was discovered which was needed to be replaced
- Despite additional work and poor weather the project was completed on time